This project required a very extensive design process including analysis and modeling of the City’s current wastewater collection system, water supply, and stormwater collection system to ensure that the new development could be supported within the current utility infrastructure.
Ultimately, the project was approved, built and opened in 2008, with the Governor of New York performing the ribbon cutting.